Campbell SAT ARGOS Bedienungsanleitung Seite 185

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 394
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 184
ZENO
®
-3200 USER MANUAL
Coastal Environmental Systems (206) 682-6048
Page 177
2 - Add Constant Value
3 - Add Two Data Values
4 - Subtract Two Data Values
5 - Multiply By A Constant
6 - Multiply Two Data Values
7 - Divide Two Data Values
8 - Quadratic
9 - Invert Data Value
10 - Raise Data Value To A Constant Power
11 - Add Multiple Data Values
12 - Polynomial
13 - Conditional Select
14 - Boolean Combine Data & Constant
15 - Boolean Combine Data
16 - Data Rounding
6 - Output and Control Processes Category 1 - Digital-To-Analog Output
10.4.2. User-Defined Process Name
Use of the User Defined Process Name field, Line Item #3 in each Process Record, is strictly optional. It
is equivalent to specifying a user-defined Sensor Name for each Sensor Record (refer to Section 10.3.6).
You can specify up to an eight-character name for process. The User-defined Process Name will appear
adjacent to a reference to the Process Record when it is used as an input to another Process Record or
Data Output Record.
Coastal Environmental Systems recommends that you use this optional field
to specify a unique name for each Process Record because that makes it
much easier to understand what your configuration is doing.
10.4.3. Selecting the Appropriate Processes
Answering the following questions will assist you in deciding what processes are required in your
configuration:
What data needs to be logged?
What data needs to be transmitted?
Which data that needs to be logged and/or transmitted comes directly from Sensor Records?
Which data that needs to be logged and/or transmitted is not directly available from individual Sensor
Records? This data needs to be processed.
How does each datum need to be processed?
In which category of processes can each datum be classified?
Which process output most closely matches each required datum?
Which data require multiple processes to be calculated?
Seitenansicht 184
1 2 ... 180 181 182 183 184 185 186 187 188 189 190 ... 393 394

Kommentare zu diesen Handbüchern

Keine Kommentare