November 2005, ARM-TR-069
A-1
SURTHREF
Preventative Maintenance Procedures
Frequency: Bi-Weekly
Mentor: Michael Ritsche, Barry Lesht
The following procedures are for performing the scheduled bi-weekly maintenance. All results
should be recorded on the PM checklist.
INSPECTION OF SITE GROUNDS NEAR THE INSTRUMENT
Visually inspect the site grounds around the instrument shelter for hazards such as rodent
burrows, buried conduit trench settling, and insect nests.
Checklist Response: No problems noted.
Problem: See CM Report
Problem: See Comments
VISUAL INSPECTION OF INSTRUMENT COMPONENTS
Stevenson Screen
Check that the Stevenson Screen is in good working order. Ensure that the paint is in good shape
and that all hardware (hinges, latches, etc) is in good shape. Check for excessive rust on moving
metallic parts, cracked components and/or slats of the Stevenson Screen. Periodic painting of the
Stevenson Screen may be required.
Checklist Response: No problems noted.
Problem: See CM Report
Problem: See Comments
Conduit, Cables, and Connectors
Check that all conduits and cables on the bottom of the control box are secure. Check all cables
and conduits for damage. Check all sensor and electrical wires inside the control box for damage.
Check the tightness of all sensor connection at the data logger. Check for water intrusion and that
the fan or heater is working.
Checklist Response: No problems noted.
Problem: See CM Report
Problem: See Comments