
Website
RM72004,00001B6 -19-02APR13-1/1
Continued on next page RM72004,00001B7 -19-02APR13-1/2
Alerts Tab
The Alerts tab is located at the bottom of the Graph Page.
When the Alerts tab is selected, the Alert (D), Type (E),
and Date/Time (F) are displayed for the management
zone and hardware alerts.
PC15026 —UN—17MAY12
A—Notes Tab
B—Alerts Tab
C—Budget Lines Tab
D—Alerts
E—Type
F— Date / Time
Budget Lines
Budget Lines tab is located at the bottom of the Graph
Page and is used to create and manage budget lines.
Budget lines display on the graph when the sum graph
type is selected and interpolation is turned on. Budget
Lines appear the same color as displayed in the lower
tab. A default Budget Line is made automatically based
on the soil type and length of probe. Budget lines are also
used as thresholds for triggering alerts to notify users of
changing conditions in the field.
NOTE: Consult your John Deere dealer or an agronomist
for recommendations of values for creating and
editing Budget Lines. Crop Type, Crop Stage,
etc., can cause optimized values to vary.
Overlapping ranges for the same budget line
type are not allowed.
Add Budget Lines
Budget lines are added by clicking the Add button and
entering the start date (A), end date (B), and values.
The are four values that are entered when creating Budget
Lines:
•
Full Point (C)
•
Full Point Warning (D)
•
Refill Point Warning (E)
•
Refill Point (F)
PC14753 —UN—21FEB12
A—Start Date
B—End Date
C—Full Point Input Box
D—Full Point Warning Input
Box
E—Refill Point Warning Input
Box
F— Refill Point Input Box
G—Save
H—Cancel
Select Save (G) to save the Budget Line.
30-16
052813
PN=32
Kommentare zu diesen Handbüchern